RESOLUTION 06-2006
WATER FEES, BUILDING PERMIT FEES AND OTHER FEES
A RESOLUTION SETTING
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF EAST TAWAKONI; WHEREAS, this city council has determined it is necessary and to the best interest of the City to revise the fee schedule for services provided by the City of East Tawakoni. The rates shall become effective
WATER & SEWER FEES
RESIDENTIAL BASE COST Water Process/Connect Fee $25.00 Water Deposit-owner occupied $100.00 plus $25 admn. fee Water Deposit-non owner occupied $200.00 plus $25 adm. fee Water Tap Inside City Limits $ 1,250.00 Sewer Tap Inside City Limits $ 1,250.00 Water Tap Outside City Limits $ 1,750.00 + cost + 10% Sewer Tap Outside City Limits $ 1,750.00 + cost + 10% Only if Service is Available IMPACT FEE FOR NEW SERVICE: Single Family or Duplex $ 1,250.00 Multi-Family (Triplex or larger) $ COMMERCIAL Water Process/Connect Fee $25.00 Water Deposit $400.00 Sewer Tap $ 2,000.00 Water Tap ¾” thru 1 ½” $ 1,500.00 Water Tap 1 ¾” & 2” $ 2,000.00 Water Tap Over 2” On request IMPACT FEE FOR NEW SERVICE: Each Building $1,500.00 MULTIFAMILY Sewer Tap 2-4 taps each $ 1,500.00 Sewer Tap 5-16 taps each $ 2,250.00 Sewer Tap 17-50 taps each On request Water Tap ¾” thru 1 ½” $ 1,500.00 Water Tap 1 ¾” & 2” $ 2,000.00 Water Tap over 2” On request PAGE TWO RESOLUTION 06-2006 21-Feb-06 OTHER FEES Backflow Inspection annual fee $ Copy Service On request Grease hood inspection semi-annual $25.00 Grease trap/interceptor inspection annual $25.00 Late Water Fee $25.00 Mowing Fee – Vacant Lots $135.00 $50.00 Mowing Fee – Dwelling Lots On request Return Check Charge $25.00 Time Payout Water & Sewer $ Water Bill paid by Master Card or Visa only Electronic payment for water bill (forms available at city hall) Annual Business Permit Amt. due + extra 3% No Charge $50.00 NEW CONSTRUCTION/ADD-ON Building Permit-per square foot $0.30 $0.20 Carport/Garage $25.00 $30.00 Storage Buildings $20.00 $30.00 Cement-all flatwork per square foot $0.15 Electrical Permit $45.00 $65.00 $25.00 Fence $20.00 Irrigation System $75.00 $50.00 HVACR $20.00 Plumbing Permit $35.00 $60.00 $25.00 $15.00 $25.00 $25.00 $50.00 PAGE THREE RESOLUTION 06-2006 21-Feb-06 COMMERCIAL Building Permit – per square foot $0.50 $0.40 $40.00 $50.00 $25.00 $40.00 Cement – all flatwork per square foot $0.25 Electrical Permit $100.00 $150.00 $200.00 $175.00 $250.00 $350.00 $50.00 $75.00 $50.00 $100.00 $100.00
THE FEES AND RATES AS LISTED ON THE FOREGOING PAGES WERE
PASSED AND APPROVED ON THIS THE 21ST DAY OF FEBRUARY, 2006, RATES SHALL BECOME EFFECTIVE ON
CITY OF
_____________________________________________
James (Buster) Thomas, MAYOR
ATTEST:
___________________________________________________
Linda Mitchell, CITY SECRETARY/TREASURER